ORGANISATION ANALYSIS
TNEB Limited
TNEB Limited
Tender activity
[Procurement of Air Pre Heaters Seals Complete Assembly with seal tabs, diaphragm seals and holding strips for APH Unit II ]2026_EB_724608_1
25/11/2026 08:30:00 AM[Supply of Air Cooled oil Gun Removable Part for Stage I and II 2Items]2026_EB_724507_1
25/11/2026 08:30:00 AM[Back Clamp PSC Pole 9.0 mtr 1900 nos]2026_EB_724616_1
17/11/2026 08:30:00 AM[Back Clamp PSC Pole 8.0 mtr 1900 nos]2026_EB_724607_1
17/11/2026 08:30:00 AM[Procurement of MS Washer 2000 kgs]2026_EB_724595_1
17/11/2026 08:30:00 AM[Supply of various SS Spares]2026_EB_724585_1
25/11/2026 08:30:00 AM[Erection of Newly Sanctioned 11 KV Avarapalayam Feeder]2026_EB_724559_1
25/11/2026 06:30:00 AM[Hiring Diesel Electric Pump for Dewatering arrangements during emergency in Camp 1 area monsoon season of 2026 2027]2026_EB_724531_1
24/11/2026 08:30:00 AM[Rewinding and Overhauling of 11 KW Motor Pump in Sewage Treatment Plant 2 at Analmin Nagar]2026_EB_724522_1
24/11/2026 08:30:00 AM[Procurement of 420KV Outdoor SF6 Circuit Breaker]2026_EB_724514_1
09/12/2026 08:30:00 AM[Repair and Maintenance Works to the Inner Rooms in Type 3 Quarters, Block No. 6 and 7 at Analmin Nagar]2026_EB_724509_1
24/11/2026 08:30:00 AM[Improvement Works to the Barbed Wire Fencing over the Compound Wall from Type 2 Block No. 39, CH 367 m to CH 661 m upto Karumariamman Temple at Analmin Nagar]2026_EB_724494_1
24/11/2026 08:30:00 AM[Repair and Maintenance Works by Stone Pitching in East end of existing Temporary Canal along CWC 1 at TTPS]2026_EB_724482_1
24/11/2026 08:30:00 AM[Procurement of 230KV Outdoor SF6 Circuit Breaker]2026_EB_724467_1
09/12/2026 08:30:00 AM[ Protection of East and West side of Cross Bund by Providing Stone Pitching for a length of 224 m of TTPS]2026_EB_724459_1
24/11/2026 08:30:00 AM[OT 77 ]2026_EB_724453_1
23/11/2026 08:30:00 AM[Protection arrangements to the Extended Primary Pond A1 Dyke Bund of Ash Dyke area from CH 1370 to CH 1645 from Old Security Room for a length of 275 m at TTPS]2026_EB_724450_1
24/11/2026 08:30:00 AM[Protection arrangements to the Extended Primary Pond A1 Dyke Bund of Ash Dyke area from CH 0 to CH 1020 from Old Security Room for a length of 1020 m at TTPS]2026_EB_724446_1
24/11/2026 08:30:00 AM[Rectification Works to the Damaged Parapet Walls in the Power House Building in Unit 4 B Row Wall B11 to B20 at 40m Elevation]2026_EB_724437_1
24/11/2026 08:30:00 AM[Remedial measures by Strengthening and Providing Protective Coating in the RCC PSC Structures in Conveyor 15 Long Span 11 16 upto JT 3E in Red Gate area North Break Water of VOC Port at ECHS areas]2026_EB_724427_1
24/11/2026 08:30:00 AM[supply of LT Single Phase Channel Cross Arm]2026_EB_724203_1
24/11/2026 08:30:00 AM[Providing One Number Diesel / Petrol Driven Vehicle on Hire Basis for the daily official use of MRT Wing for LTCT]2026_EB_724575_1
17/11/2026 09:30:00 AM[Dindigul EDC - Works Contract - Labour charges of 5 MVA Power Transformer Erection and Oil filtration Works and Replacement of oil in existing 8 MVA Indo tech Power transformer-II in 33/11KV Vallipatty SS.]2026_EB_724502_1
25/11/2026 11:30:00 AM[Erection of Newly Sanctioned 11 KV Ramapalayam Feeder]2026_EB_724488_1
25/11/2026 06:30:00 AM[Supply of LT Three Phase Angle Cross Arm ]2026_EB_724498_1
23/11/2026 08:30:00 AM[Supply of Seal Steam Exhauster fan with motor for 210MW KWU Turbine]2026_EB_724479_1
24/11/2026 08:30:00 AM[Supply of Control and Protection Panels for Feeder, Transformer, Capacitor Bank, Bus-Coupler and Bus-bar for 230kV, 110kV Sub-stations]2026_EB_724460_1
08/12/2026 08:30:00 AM[TTPS Operation Circle CAD Unit IV and V Annual overhauling work Overhauling of Internal and External assemblies and attending wornout internal parts repair and reconditioning work of C.W.P 4A, 4B, 4C and 4D and 5A, 5B, 5C and 5D at CWPH II]2026_EB_724431_1
17/11/2026 08:30:00 AM[TTPS Operation Circle CAD Dismantling, Re erection of 600NB dia spool piece sea water pipes for cleaning and removal of deposited marine cells growth from condenser cooling water inlet to outlet tapping of Unit IV and V ACW system]2026_EB_724420_1
17/11/2026 08:30:00 AM[Providing One Number Diesel driven Van/Jeep or equivalent for the use of Executive Engineer/Elect/Divi-IV/ESEZ STPP and his staff]2026_EB_724149_1
25/11/2026 08:30:00 AM[Erection of Newly Sanctioned 11 KV Ponnagar Feeder]2026_EB_724519_1
25/11/2026 06:30:00 AM[Erection of Newly Sanctioned 11 KV Ugayanur Feeder]2026_EB_724527_1
25/11/2026 06:30:00 AM[Erection of Newly Sanctioned 11 KV Kuppuchipalayam Feeder ]2026_EB_724541_1
25/11/2026 06:30:00 AM[CE NCTPS III SE M I OT 47R 26 27]2026_EB_719829_2
16/11/2026 08:30:00 AM[Procurement of 765KV 160KN 210KN Polymer Composite Insulators]2026_EB_724486_1
26/11/2026 08:30:00 AM[Erection of Newly Sanctioned 11 KV Andipalayam Feeder]2026_EB_724549_1
25/11/2026 06:30:00 AM[ Improvement Estimate for supply and spreading of 20mm HB stone inside the 110KV yard of 110/22KV Dindigul SS ]2026_EB_724455_1
25/11/2026 11:00:00 AM[Routine Maintenance _ Cleaning, Sweeping , Collection of Garbages and debris, sweeping and Clearing of litter and dry leaves along road and buildings sides in U , V Type quarters at vallur camp for the period of one year from the date of commencemen]2026_EB_724444_1
25/11/2026 08:30:00 AM[Removal of vegetation and accumulated silt in the PWD CANAL at Vallur camp.]2026_EB_724429_1
25/11/2026 08:30:00 AM[OT 51/26-27]2026_EB_724423_1
24/11/2026 08:30:00 AM[Supply of Worm shaft bearings for XRP 763 bowl mills of Unit I Mills 1B, 1C, 1D and 1E]2026_EB_724418_1
26/11/2026 08:30:00 AM[Clearing the drains along the both sides of 370 S road upto Hot water Channel including Underground drains below railway lines and jungle clearance at the sides of the both drain in 370 s road in NCTPS_I.]2026_EB_724414_1
25/11/2026 08:30:00 AM[Cleaning the earthen drain and RCC drain at ICHS area.]2026_EB_724408_1
25/11/2026 08:30:00 AM[CE-MTPSI-SE-ES-CI-OT48-26-27]2026_EB_724405_1
24/11/2026 08:30:00 AM[Cleaning the earthen drain and RCC drain at ECHS area.]2026_EB_724399_1
25/11/2026 08:30:00 AM[Supply of Strainer along with connected pipes and fittings for ash water pump house in Unit IV and V]2026_EB_724401_1
26/11/2026 08:30:00 AM[Procurement cooling coil for BFP Mechanical seal coolers in Unit I and II]2026_EB_724407_1
26/11/2026 08:30:00 AM[CE-MTPSI-SE-ES-EM-2-OT47-26-27]2026_EB_724391_1
24/11/2026 08:30:00 AM[Comprehensive Maintenance contract for supply of manpower for the maintenance of all network equipment in Regional data centre and network connectivity of Project BEST in Tirunelveli Region for a period of one year.]2026_EB_724385_1
24/11/2026 08:30:00 AM[Execution of Capital, Improvement and DCW Work in Urban Tirunelveli division in respect of Tirunelveli EDC]2026_EB_724370_1
25/11/2026 08:30:00 AM[NCTPS_II_UI_Spec_214_BM]2026_EB_724275_1
17/11/2026 08:30:00 AM[ Works contract for HT/LT/line and other allied extension works in Rural Gobi Subdivision of Gobi Division]2026_EB_724318_1
25/11/2026 07:30:00 AM[NCTPS_II_UI_Spec_213_BM]2026_EB_724274_1
17/11/2026 08:30:00 AM[NCTPS_II_UI_Spec_212_BM]2026_EB_724273_1
17/11/2026 08:30:00 AM[supply of 11 KV Polymer Composite Pin Insulator]2026_EB_724315_1
25/11/2026 08:30:00 AM[supply of LT Pin Insulator]2026_EB_724313_1
25/11/2026 08:30:00 AM[200 NB Manual Operated Knife gate valve assembly (As per sample available at Site)]2026_EB_724302_1
17/11/2026 08:30:00 AM[Supply of Carbon Steel Fin Plates for Boiler 6 Items]2026_EB_724298_1
25/11/2026 08:30:00 AM[Inspection of primary Air coal bend]2026_EB_724258_1
17/11/2026 08:30:00 AM[Turn over panel clip assembly 1 to 3 rows]2026_EB_724257_1
17/11/2026 08:30:00 AM[Turn over panEl clip assembly 7 to 9 rows]2026_EB_724256_1
17/11/2026 08:30:00 AM[Turn over panel clip assembly 4 to 6 rows]2026_EB_724255_1
17/11/2026 08:30:00 AM[Turn over panel clip assembly 10 to 12 rows]2026_EB_724254_1
17/11/2026 08:30:00 AM[OT 95 Overhauling of HP LP valves and control valves.]2026_EB_724253_1
17/11/2026 08:30:00 AM[Cleaning of Boiler tubes by buffing wheel]2026_EB_724244_1
17/11/2026 08:30:00 AM[Strengthening of eroded SS inner or outer Diffuser and its allied works]2026_EB_724243_1
17/11/2026 08:30:00 AM[Overhauling of water wall soot blowers]2026_EB_724240_1
17/11/2026 08:30:00 AM[Fixing of New Cassette Baffle for Economizer lower banks Coils of Super heater ]2026_EB_724239_1
17/11/2026 08:30:00 AM[ Renewal of defective boiler tubes bends in Water wall tubes Front ]2026_EB_724237_1
17/11/2026 08:30:00 AM[Radiography and developing the image in welding joints of defective boiler tubes ]2026_EB_724236_1
17/11/2026 08:30:00 AM[ OT 61 Inspection of PA FD fan A and B ]2026_EB_724228_1
17/11/2026 08:30:00 AM[OT 62 Diffuser in ID Fan A and B]2026_EB_724227_1
17/11/2026 08:30:00 AM[Improvement Providing a new PCC Retaining wall with chain link fencing With gate from yard area to control room approach road side of Keelapalur 33 11 KV SS at Perambalur EDC]2026_EB_723866_1
23/11/2026 08:30:00 AM[Providing a new PCC Retaining wall with chain link fencing a side the Section office to near control room of Keelapalur 33 11 KV SS at Perambalur EDC]2026_EB_723838_1
23/11/2026 08:30:00 AM[Improvement works by Providing additional Cable trench in existing Battery Room at Keelapalur 33 11 KV SS]2026_EB_723724_1
23/11/2026 08:30:00 AM[Procurement of MS Bolt Nut of size 3and half 5 by 8]2026_EB_724199_1
25/11/2026 09:00:00 AM[Procurement of MS Bolt Nut of size 4and half 5 by 8]2026_EB_724261_1
25/11/2026 09:00:00 AM[Procurement of MS Bolt Nut of size 2and half 5 by 8]2026_EB_724186_1
25/11/2026 09:00:00 AM[Provision of one no. petrol/diesel driven Van/Equivalent vehicle on hire basis for the official use of Assistant Executive Engineer /TLC /Ambattur I]2026_EB_724259_1
25/11/2026 08:30:00 AM[OT 67 Cleaning of the accumulated ash inside Hot Primary Air ducts A Side]2026_EB_724225_1
16/11/2026 08:30:00 AM[Cleaning of the accumulated ash inside Hot Primary Air ducts]2026_EB_724224_1
16/11/2026 08:30:00 AM[OT 71 Overhauling of APH B]2026_EB_724218_1
16/11/2026 08:30:00 AM[OT 68 Overhauling of APH A]2026_EB_724220_1
16/11/2026 08:30:00 AM[Renewal of defective boiler tubes ]2026_EB_724211_1
16/11/2026 08:30:00 AM[Renewal of defective boiler tubes in Economizer hanger tubes ]2026_EB_724209_1
16/11/2026 08:30:00 AM[Overhauling of Flue gas dampers]2026_EB_724208_1
16/11/2026 08:30:00 AM[supply of LT Three Phase Angle Cross Arm]2026_EB_724201_1
23/11/2026 08:30:00 AM[Supply of Fluorescent Orange jacket]2026_EB_724198_1
23/11/2026 08:30:00 AM[Works contract for Provision of 1 no 33 KV Source Link line and 5 nos 11 KV Link feeder line works in newly erected 33 /11 KV Pernaickenpatti SS in Sithurajapuram section of Sivakasi Division]2026_EB_724190_1
25/11/2026 08:30:00 AM[Imp works by replacing the damaged worn out existing wirings, lightings with other electrical accessories in AEE PRO, AEE GL, AE MM, AE Development office rooms and providing new aluminium partition between AE GL and AE Development at Centre Office]2026_EB_724176_1
24/11/2026 08:30:00 AM[Improvement works along with other allied Civil works to the AEE T.Kallupatti, AE Rural T.Kallupatti and AE Town T.Kallupatti and Collection centre in T.Kallupatti TNEB campus pertaining to Thirumangalam Division of Madurai EDC, Madurai District]2026_EB_724135_1
24/11/2026 08:30:00 AM[Improvement works by providing colourwash and whitewash to the CSO office buildings, B section building, D Section Aluminium Scrap godown building and A and C Section Office Building at Pasumalai stores TNEB Campus, Madurai]2026_EB_724130_1
24/11/2026 08:30:00 AM[Imp works by replacing the damaged weathering course, doors, windows and providing necessary wiring arrangements along with allied civil works to the A section aluminium godown, A section office,Store rooms, D section office, store rooms at Pasumalai]2026_EB_724108_1
24/11/2026 08:30:00 AM[OT58]2026_EB_724093_1
23/11/2026 08:30:00 AM[Imp works by replacing the damaged weathering coarse, doors, windows and providing necessary wiring arrangements along with allied civil works to the CSO office buildings, B section building and godown building at Pasumalai TNEB Campus, Madurai]2026_EB_724070_1
24/11/2026 08:30:00 AM[Imp works by providing false ceiling to the AE Protection office, Aluminium partition to the proposed toilet, tiles flooring to the EE MRT cabin and necessary painting works to the EE MRT, AE Protection and AE Metering office buildings at Pasumalai]2026_EB_724060_1
24/11/2026 08:30:00 AM[Erection of additional new GI earth pits ]2026_EB_724216_1
23/11/2026 08:30:00 AM[OT73 Applying new refractory in required buck stay]2026_EB_724194_1
16/11/2026 08:30:00 AM[OT78]2026_EB_724188_1
23/11/2026 08:30:00 AM[HIRING OF ONE NUMBER DIESEL/PETROL DRIVEN (ON PAR WITH DIESEL RATE) VAN /JEEP FOR 1 YEAR]2026_EB_724107_1
23/11/2026 08:30:00 AM[Procurement of L.T. PIN Insulator]2026_EB_724086_1
23/11/2026 09:00:00 AM[ Procurement of L.T. Shackle insulator]2026_EB_724061_1
23/11/2026 09:00:00 AM[procurement of L.T. Guy Shackle Insulator ]2026_EB_723814_1
23/11/2026 09:00:00 AM[ procurement of L.T. G I PIN]2026_EB_723766_1
23/11/2026 09:00:00 AM[ Procurement of L.T. Metal Parts ]2026_EB_723685_1
23/11/2026 09:00:00 AM[Providing One Number Diesel driven Van/Jeep or equivalent for the use of Executive Engineer/Electrical/Division X/Ennore SEZ STPP]2026_EB_723531_1
23/11/2026 08:30:00 AM[WOT-CIVIL-05-2026-2027 ]2026_EB_724165_1
13/11/2026 08:30:00 AM[OT60]2026_EB_724138_1
23/11/2026 08:30:00 AM[Enq.no.27/26-27- Supply of 11 KV Transformer Structure Material for DP structure.]2026_EB_724124_1
24/11/2026 06:30:00 AM[Enq.no.26/26-27- Supply HS Type straight joint Kit suitable for 33KV 1X630 sqmm XLPE UG Cable.]2026_EB_724117_1
24/11/2026 06:30:00 AM[Enq.no.25/26-27- Supply of 11KV AB Switches 200 Amps with 11KV PT Insulators.]2026_EB_724104_1
24/11/2026 06:30:00 AM[OT57]2026_EB_724072_1
23/11/2026 08:30:00 AM[Labour charges for providing of dummy gaskets 8 nos in the pipelines of GT compressor during off line water washing and then normalizing for two times at KGTPSMaruthur]2026_EB_723613_1
25/11/2026 08:30:00 AM[Procurement of Bulk Chemicals required for Feed Water System And Cooling water system at KGTPS Maruthur]2026_EB_723590_1
25/11/2026 08:30:00 AM[Procurement 210Litres of Liquid detergent for Off line water washing of Gas Turbine Compressor at Kuttalam GTPS]2026_EB_723577_1
25/11/2026 08:30:00 AM[Labour charges for loading of 5 MVA Make ANDREW YULE and Co Ltd Power Transformer at 33/11 KV Gangaikondan SS in Cuddalore EDC, Transport work from 33/11 KV Gangaikondan SS in Cuddalore EDC to 33/11 KV Vallipatty SS and unloading at vallipatty ss]2026_EB_724141_1
23/11/2026 09:30:00 AM[Procurement of Uniform Cloths for the year of 2025-2026 as per specification]2026_EB_724120_1
21/11/2026 08:30:00 AM[OT59]2026_EB_724133_1
23/11/2026 08:30:00 AM[OT 56 Renewal of Metallic expansion joints]2026_EB_724121_1
23/11/2026 08:30:00 AM[OT 55 Screen Plate]2026_EB_724112_1
23/11/2026 08:30:00 AM[Labour charges for repairing and rewinding of the following 5 nos.LT motors (i) 75KW/ 100HP/3phase/415V/ 1475RPM/ABB Make in ACC Fan Motor#2 (ii) 45KW/60HP/3phase/415V/ 2950RPM/ Kirloskar make in IPBFP#2 (iii)15KW/20HP/3 phase/415V/2890RPM/ Kirlos]2026_EB_721955_1
23/11/2026 08:30:00 AM[E-tender for Providing One No. Diesel/Petrol driven Vehicle Van/Jeep/Car on Hire basis for official use of the Executive Engineer/E/PE/ Thanjavur for a period of one year from the date of utilization of vehicle]2026_EB_724103_1
23/11/2026 08:30:00 AM[Supply of TC Fuse wire 12,14,16,18 and 32 SWG]2026_EB_724122_1
23/11/2026 08:30:00 AM[E-tender for Providing One No. Diesel/Petrol driven Vehicle Van/Jeep/Car on Hire basis for official use of the Executive Engineer/TLC/Trichy for a period of one year from the date of utilization of vehicle.]2026_EB_724110_1
23/11/2026 08:30:00 AM[E-tender for Providing One No. Diesel/Petrol driven Vehicle Van/Jeep/Car on Hire basis for official use of the Executive Engineer/E/PE/Trichy for a period of one year from the date of utilization of vehicle.]2026_EB_724119_1
23/11/2026 08:30:00 AM[E-tender for Providing One No. Diesel/Petrol driven Vehicle Van/Jeep on Hire basis for official use of the Assistant Executive Engineer/TE-I/ Trichy for a period of one year from the date of utilization of vehicle.]2026_EB_724123_1
23/11/2026 08:30:00 AM[OT 47 Releasing and replacement of CWP Motor COT 47 Releasing and replacement of CWP Motor C]2026_EB_724096_1
23/11/2026 08:30:00 AM[Establishment of new 33/11 KV SS at Vadamattam]2026_EB_724063_1
03/12/2026 06:30:00 AM[OT 54 Overhauling of Primary crusher ]2026_EB_724065_1
23/11/2026 08:30:00 AM[Procurement of Various sizes of Hexagonal Head special grade fasteners for XRP 1043 Bowl Mill for Unit I and II]2026_EB_724053_1
23/11/2026 08:30:00 AM[MTPS I M II O AHS Supply of 1 No Diesel driven van TATA SUMO or equivalent on hire basis for the official use of the Executive Engineer O AHS MTPS-I]2026_EB_723914_1
23/11/2026 08:30:00 AM[M.S. Bolt and Nut M16X65mm 2000 Kgs]2026_EB_723916_1
13/11/2026 08:30:00 AM[WOT-CIVIL-04-2026-2027]2026_EB_723840_1
21/11/2026 08:30:00 AM[WOT-CIVIL-03-2026-2027]2026_EB_723747_1
21/11/2026 08:30:00 AM[WOT-CIVIL-02-2026-2027]2026_EB_723674_1
21/11/2026 08:30:00 AM[Supply and Erection of new Chinnakulathupalayam 33 11 KV SS Electrical Works in Karur EDC Except Power Transformer and Breaker]2026_EB_723141_1
21/11/2026 08:30:00 AM[Overhauling and Servicing of Instrument Air Compressors in the Plant Air Compressor system ]2026_EB_723812_1
12/11/2026 08:30:00 AM[HV eecontrols at kph]2026_EB_723839_1
24/11/2026 08:30:00 AM[MTPS I M II O AHS Retrieving the accumulated ash over and under the 08 Nos ash slurry pipe streams]2026_EB_723895_1
20/11/2026 08:30:00 AM[HV SE CAR at MINPARAI]2026_EB_723879_1
24/11/2026 08:30:00 AM[M.S. Bolt AND Nut M16X90 mm 2000 Kgs]2026_EB_723905_1
13/11/2026 08:30:00 AM[OT 46/26-27]2026_EB_723885_1
16/11/2026 08:30:00 AM[OT 53 ]2026_EB_723887_1
20/11/2026 08:30:00 AM[TTPS Operation Circle CAD Overhauling and Reconditioning the worn out pump assembly of chlorine dozing pump A and B, and Screen wash pump 1, 2 and 3 at CWPH I]2026_EB_723874_1
23/11/2026 08:30:00 AM[OT 52]2026_EB_723661_1
20/11/2026 08:30:00 AM[OT 50 Centrifugal]2026_EB_723635_1
20/11/2026 08:30:00 AM[OT 49]2026_EB_723602_1
20/11/2026 08:30:00 AM[Electrical Works For Enhancement of Power Transformer Capacity from 1x8 MVA to 2x8 MVA at Chimmitahalli 33/11 KV SS (Hill area) (except supply and Erection of Pr Tr and supply of Breaker)]2026_EB_723669_1
25/11/2026 09:30:00 AM[NCTPSI SEMII Circle AHP Dn UnitIII AOH works 2026 27 overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of Ash water tank and Ash slurry Sump etc in Ash Handling pump House]2026_EB_723656_1
10/11/2026 08:30:00 AM[Procurement of Various sizes of brass stem nut for motor operated MAL valves ]2026_EB_723662_1
15/11/2026 08:30:00 AM[ SE/O/CBE/Tiruppur Lines / ET-27/2026-27,dated.29.10.2026]2026_EB_723655_1
19/11/2026 08:30:00 AM[To carry out the work of Meter Reading of Current Consumption in consumer premises using Mobile App Auto and Manual Mode through optical probe Bluetooth transmitter in Udumalpet Division of Udumalpet Circle duly engaging Meter Readers of 12 Nos for ]2026_EB_723587_1
14/11/2026 08:30:00 AM[ SE/O/CBE/Palladam Lines / ET-26/2026-27,dated.29.10.2026]2026_EB_723611_1
19/11/2026 08:30:00 AM[Imp works by replacing the damaged weathering course, doors, windows and providing necessary wiring arrangements, sanitary arrangements, vehicle shed along with allied civil works to the EE MRT, AE Protection and AE Metering office buildings at Pasum]2026_EB_723445_1
24/11/2026 08:30:00 AM[M.283/2026-27 Procurement of 33KV 3 x 400 sqmm XLPE Aluminium UG Cable ]2026_EB_723570_1
07/12/2026 08:30:00 AM[OT04/2026-27]2026_EB_723572_1
20/11/2026 08:30:00 AM[Improvement works to Stationery store building of Central stores and sub-store building/Udumalpet Division at Central store premises Udumalpet EDC]2026_EB_723576_1
20/11/2026 08:30:00 AM[OT 48 lub oil system]2026_EB_723539_1
20/11/2026 08:30:00 AM[OT 39 IAC 2]2026_EB_723304_1
20/11/2026 08:30:00 AM[LT 3 Phase Channel x arm]2026_EB_723196_1
19/11/2026 08:30:00 AM[Replacing the damaged floor Tiles in T1 Type Quarters Building ]2026_EB_721855_1
23/11/2026 08:30:00 AM[Removal, cleaning and re-fixing of GT inlet air filters ,cleaning of filter house]2026_EB_721835_1
23/11/2026 08:30:00 AM[Replacement of existing shaft with new/reconditioned shaft in ACHE fan # 8]2026_EB_721796_1
23/11/2026 08:30:00 AM[Comprehensive annual maintenance contract for 1No. Passenger lift in VGTPS / Phase-II]2026_EB_721739_1
23/11/2026 08:30:00 AM[Supply and erection of 33KV and 4 nos 11KV feeders in 33/11KV Melmaruvathur SS under Turnkey basis]2026_EB_723312_1
24/11/2026 08:30:00 AM[MANUFACTURE FABRICATION SUPPLY ERECTION TESTING AND COMMISSIONING OF 33KV SUBSTATION AT PARIVAKKAM]2026_EB_723270_1
26/11/2026 09:30:00 AM[ Construction of 33/11KV Outdoor SS Control room building with electrification and civil works at 33/11 KVSS kotturin virudhunagar EDC]2026_EB_723189_1
24/11/2026 08:30:00 AM[Procurement of Three Phase Angle Cross Arm]2026_EB_722735_1
20/11/2026 09:00:00 AM[Procurement of 52 nos. of 33KV Indoor VCB panels]2026_EB_722695_1
09/12/2026 08:30:00 AM[ Procurement of Three Phase Channel Cross Arm]2026_EB_722598_1
20/11/2026 09:00:00 AM[Procurement of Guarding Cross Arm]2026_EB_722502_1
20/11/2026 09:00:00 AM[Procurement of Tapping Channel Cross Arm]2026_EB_722378_1
21/11/2026 09:00:00 AM[Procurement of Stay Set Complete]2026_EB_721908_1
20/11/2026 09:00:00 AM[Supply of LT Shackle and Metal Parts]2026_EB_723691_1
12/11/2026 07:30:00 AM[CE NCTPS III SE M I OT 49 26 27]2026_EB_723694_1
23/11/2026 08:30:00 AM[Procurement of 14Cx2.50Sqmm ACC Cable]2026_EB_723744_1
08/12/2026 08:30:00 AM[Establishment of new 33/11 KV SS at Vilattur]2026_EB_723723_1
02/12/2026 08:30:00 AM[Supply, Fabrication and Erection of GI steel structures, earthing materials, etc., for Pudhupalapattu 110kV SS]2026_EB_723668_1
26/11/2026 08:30:00 AM[Supply, Fabrication and Erection of GI steel structures, earthing materials, etc., for Poyyur 110kV SS]2026_EB_723644_1
24/11/2026 08:30:00 AM[Clearing the storm water drain in between main gate to Union office, 80 S road and leading from FOPH Security guard room, rear side of ware house upto Discharge point 1 (Hot water channel ) inside NCTPS_I.]2026_EB_723578_1
21/11/2026 08:30:00 AM[Provision of 1No Diesel driven Hiring vehicle for the official use of EE/Civil, O/o CE/D/Trichy for 1year]2026_EB_723552_1
20/11/2026 08:30:00 AM[Cleaning the storm water drains and culverts in the Quarters area at Vallur camp.]2026_EB_723535_1
21/11/2026 08:30:00 AM[Periodically cleaning of waste water drain from 0 meter TG floor inside at NCTPS_I for the period of one year from the date of commencement.]2026_EB_723480_1
21/11/2026 08:30:00 AM[Periodically cleaning of drains in A row, Transformer yard, Service building and around switch yard building for a period of one year from the date of commencement of work.]2026_EB_723465_1
21/11/2026 08:30:00 AM[Clearing and removing the sand, silt and slush in the existing peripheral drains and forming earthern drain on the eastern side of the Athipattu camp]2026_EB_723302_1
21/11/2026 08:30:00 AM[Replacing of damaged 160 mm dia PVC rain water downfall pipes in Service Building south side and roof top rain water drain arrangements at NCTPS]2026_EB_723254_1
21/11/2026 08:30:00 AM[TTPS MechII TM II Unit IV Overhaul of Condensate Regeneration system during overhaul 2026 27]2026_EB_723449_1
21/11/2026 08:30:00 AM[TTPS MechII TM II KWU Turbine Unit V Removal of insulation in HP IP casing and its pipe lines HP IP LPBP Stop and control valves MS HRH strainers and re insulating the same after completion of Capital Overhaul including the supply of insulating ]2026_EB_723429_1
21/11/2026 08:30:00 AM[TTPS MechII TM II UnitV Overhaul of Condensate Regeneration system during overhaul 202627]2026_EB_723413_1
13/11/2026 08:30:00 AM[Providing 1 No. Van/Jeep/Car (Diesel/Petrol Driven) on hire basis (Registered within 5/7 Years) for the use of Executive Engineer/ Operation/ Mondipatty for a period of one year]2026_EB_723474_1
20/11/2026 09:30:00 AM[Providing 1 No. Van/Jeep (Diesel/Petrol Driven) on hire basis (Registered within 10 Years) for the use of Assistant Executive Engineer/ Lines/ Trichy for a period of one year]2026_EB_723459_1
20/11/2026 09:30:00 AM[ETS No 36/26-27 of SE GCC Cbe]2026_EB_723246_1
21/11/2026 08:30:00 AM[Supply of HT TI Fittings]2026_EB_723358_1
20/11/2026 08:30:00 AM[Supply of 3.6 feet V Cross Arm and 4.6 feet V Cross Arm ]2026_EB_723397_1
19/11/2026 08:30:00 AM[Spares for K G KHOSALA Make Air Compressor of Model 2HA2QT 4 Items]2026_EB_723228_1
23/11/2026 08:30:00 AM[Supply of LT Three Phase Angle Cross Arm]2026_EB_723261_1
20/11/2026 08:30:00 AM[Supply of Aluminium Knob]2026_EB_723225_1
20/11/2026 08:30:00 AM[PROCUREMENT OF Over Current and Earth fault Relay 72 Nos]2026_EB_723195_1
20/11/2026 08:30:00 AM[Procurement of LED Light Fittings 4 Items]2026_EB_723139_1
23/11/2026 08:30:00 AM[Supply of Tapping Channel Cross Arm]2026_EB_723301_1
20/11/2026 08:30:00 AM