Skip to Content
ORGANISATION ANALYSIS

U P Irrigation Department (Civil)

U P Irrigation Department (Civil)

Tenders2035
Active2035
Results0
Companies0

Tender activity

[Retender Lot No 12 Silt Clearance]2026_UPIDC_1202245_18
16/11/2026 04:30:00 am
[Retender Lot No 13 Silt Clearance]2026_UPIDC_1202245_17
16/11/2026 04:30:00 am
[Silt Clearance of Bibipur Mr. from Km. 0.000 to 2.600 and Sadaso Mr. from km. 0.000 to 1.700 and Muradpur Mr. from km. 0.000 to 1.700, Kurauli Mr. from km. 0.000 to 4.200 and Kuranga Mr. from km. 0.000 to 3.600]2026_UPIDC_1194148_50
16/11/2026 04:30:00 am
[Clearance of Internal section of High Level Feeder Canal from Km 2.500 to Km. 9.000 in District Prayagraj.]2026_UPIDC_1196799_24
16/11/2026 05:30:00 am
[Earth Work in Silt Clearance Bed Side slope Scrapping Of Turkauliya Minor From K.M. 0.000 To K.M. 3.600]2026_UPIDC_1200560_54
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Mahla Minor (from km 0.000 to km 1.800)]2026_UPIDC_1200560_53
16/11/2026 06:30:00 am
[Scraping work of bed and side slopes of Dhusari Minor (from km 0.000 to km 2.900]2026_UPIDC_1200560_52
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Dafra Minor (from km 0.000 to km 2.100)]2026_UPIDC_1200560_51
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Lakhanpara Minor (from km 0.000 to km 3.700) ]2026_UPIDC_1200560_50
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Kapiya Minor (from km 0.000 to km 3.700)]2026_UPIDC_1200560_49
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Katya Minor (from km 0.000 to km 2.800)]2026_UPIDC_1200560_48
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Bhavpur Minor (from km 0.000 to km 5.300)]2026_UPIDC_1200560_47
16/11/2026 06:30:00 am
[Silt Earth clearance work of Atari Minor from km. 0.000 to km. 4.400, before running period of canal 1434 Rabi FasliSilt Earth clearance work of Atari Minor from km. 0.000 to km. 4.400, before running period of canal 1434 Rabi Fasli]2026_UPIDC_1200560_46
16/11/2026 06:30:00 am
[Scraping work in internal section of Narayanpur Minor from km 0.000 to km 4.600 before running period of canal 1434 Rabi Fasli]2026_UPIDC_1200560_45
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Chaurasi Minor (from km 0.000 to km 8.000) ]2026_UPIDC_1200560_44
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Jagdishpur Minor from km 0.000 to km 5.900]2026_UPIDC_1200560_43
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Naugarh Minor from km 0.000 to km 10.100]2026_UPIDC_1200560_42
16/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Udaipur Minor from km 0.000 to km 8.100]2026_UPIDC_1200560_41
16/11/2026 06:30:00 am
[Scraping work of bed and side slopes of Kodra Minor from km 0.000 to km 6.600]2026_UPIDC_1200560_40
16/11/2026 06:30:00 am
[Scraping work in internal section from km 0.000 to km 2.000 Silt Earth Clearance work from km. 2.000 to 6.600 of Champapur Minor before running period of canal 1434 Rabi Fasli]2026_UPIDC_1200560_39
16/11/2026 06:30:00 am
[Lot 18 MCD Retender]2026_UPIDC_1198620_27
16/11/2026 09:30:00 am
[Lot 16 MCD Retender]2026_UPIDC_1198620_26
16/11/2026 10:30:00 am
[LOT1]2026_UPIDC_1207108_1
18/11/2026 10:30:00 am
[Silt Clearance and Scrapping of Richhaura Distributary from Km 0.000 to km 16.405]2026_UPIDC_1201130_2
16/11/2026 06:30:00 am
[As per tender Notice (Lot-01)]2026_UPIDC_1206862_1
16/11/2026 09:30:00 am
[Canal Construction of Kurena Dy. from Km. 7.575 to km. 7.800 and Construction of 01 No VRB. Lo2]2026_UPIDC_1206212_1
19/11/2026 06:30:00 am
[Canal Construction of Utravali Dy From km 8.000 to km. 10.900 and C.C. Lining from K. 7.980 to 8.820 and Construction of 01 No. VRB and restoration work of 03 Nos VRBs. Lot-1]2026_UPIDC_1206188_1
19/11/2026 06:30:00 am
[Tree Felling of 1 teak, 05 neem and 09 Mango Dead trees]2026_UPIDC_1206741_2
16/11/2026 05:30:00 am
[Tree Felling of 1 neem and 22 teak Green trees]2026_UPIDC_1206741_1
16/11/2026 05:30:00 am
[Silt Clearance of Approach Channel and Feeder Channel from km. 0.000 to 0.200 ]2026_UPIDC_1204694_1
16/11/2026 06:30:00 am
[Kichha nahar ko rabi fasli varsh 1434 men punah sanchalit karne hetu asthai bandhe ka nirman ]2026_UPIDC_1198911_2
13/11/2026 08:30:00 am
[Silt clearance from km 0.000 to km 2.700 of Jamuniya Mr]2026_UPIDC_1193999_142
14/11/2026 06:30:00 am
[Silt clearance from km 0.000 to km 3.900 of Chakiya Mr]2026_UPIDC_1193999_141
14/11/2026 06:30:00 am
[Silt clearence Lot 69]2026_UPIDC_1203127_2
12/11/2026 10:30:00 am
[Silt clearence Lot 68]2026_UPIDC_1203138_2
12/11/2026 10:30:00 am
[Silt clearence Lot 67]2026_UPIDC_1203152_2
12/11/2026 10:30:00 am
[Silt clearence Lot 64]2026_UPIDC_1203171_2
12/11/2026 10:30:00 am
[Silt clearence Lot 63]2026_UPIDC_1203176_2
12/11/2026 10:30:00 am
[Silt clearence Lot 60]2026_UPIDC_1203214_2
12/11/2026 10:30:00 am
[Silt clearence Lot 59]2026_UPIDC_1203235_2
12/11/2026 10:30:00 am
[Silt clearence Lot 57]2026_UPIDC_1203268_2
12/11/2026 10:30:00 am
[Silt clearence Lot 52]2026_UPIDC_1203423_2
12/11/2026 10:30:00 am
[Silt clearence Lot 51]2026_UPIDC_1203433_2
12/11/2026 10:30:00 am
[Silt clearence Lot 50]2026_UPIDC_1203434_2
12/11/2026 10:30:00 am
[Silt clearence Lot 43]2026_UPIDC_1203464_2
12/11/2026 10:30:00 am
[Silt clearence Lot 39]2026_UPIDC_1203470_2
12/11/2026 10:30:00 am
[Silt clearence Lot 24]2026_UPIDC_1203517_2
12/11/2026 10:30:00 am
[Silt clearence Lot 23]2026_UPIDC_1203520_2
12/11/2026 10:30:00 am
[Silt clearence Lot 21]2026_UPIDC_1203527_2
12/11/2026 10:30:00 am
[Silt clearence Lot 6]2026_UPIDC_1203649_2
12/11/2026 10:30:00 am
[Silt clearence Lot 2]2026_UPIDC_1203664_2
12/11/2026 10:30:00 am
[Silt clearence Lot 1]2026_UPIDC_1203670_2
12/11/2026 10:30:00 am
[SILT CLEARANCE/SCRAPPING WORK OF MAURAWAN DY. FROM KM 58.600 TO KM 72.400]2026_UPIDC_1198877_50
12/11/2026 10:30:00 am
[Providing launching apron with top layer in wire crates (2.5x1.5x1.0M) using stone boulder from 25-60 kg in front of gate no.-3 to 4 in down stream of Adwa Barrage Site.]2026_UPIDC_1206721_1
18/11/2026 08:30:00 am
[Renovation of Service Road on the left bank of Purwa Branch From Km. 64.548 to Km. 65.440]2026_UPIDC_1205886_1
14/11/2026 07:30:00 am
[Scrapping Internal Section of Mavaiya Minor from Km 2.600 to Km. 10.00]2026_UPIDC_1201144_42
12/11/2026 05:30:00 am
[Lot-06 Sirsi]2026_UPIDC_1202419_17
16/11/2026 11:30:00 am
[Lot-04 Sirsi]2026_UPIDC_1202419_16
16/11/2026 11:30:00 am
[Restoration of Connection road of Chota Kosi cross regulator from km 136.387 to km 137.202 of Agra canal.]2026_UPIDC_1205237_3
16/11/2026 11:30:00 am
[Provisions Pucca daula around bituminous road from km 110.179 to km 113.175 of agra canal.]2026_UPIDC_1205237_2
16/11/2026 11:30:00 am
[Provisions Pucca daula around bituminous road at left bank agra canal from km 75.200 to km 78.400 of agra canal.]2026_UPIDC_1205237_1
16/11/2026 11:30:00 am
[Construction of VRB at KM 1.220 of Thati minor(L4)]2026_UPIDC_1200823_7
13/11/2026 12:30:00 pm
[Construction of fall of Kirari minor at KM 2.5 (Lot3)]2026_UPIDC_1200823_6
13/11/2026 12:30:00 pm
[Construction of fall of kirari minor at KM 0.600(lot2)]2026_UPIDC_1200823_5
13/11/2026 12:30:00 pm
[TN 14/EE/2026-27 Repair of Cattle Ghat at Km. 3.900, 5.900, 6.400, 8.500 (U/S) and 8.500 (D/S) of Right Salawa Dy. (Lot-8)]2026_UPIDC_1204638_8
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Repair of Cattle Ghat at Km. 21.810, 24.710, 26.650 and 27.950 of Right Salawa Dy. (Lot-9)]2026_UPIDC_1204638_9
11/11/2026 09:30:00 am
[Silt clearance of Pathkhauli Minor Between Km. 0.000 to 3.200 and Scrapping work Between Km. 3.200 to Km. 4.200]2026_UPIDC_1198979_100
12/11/2026 06:30:00 am
[Silt clearance of Jogiya mr. Between Km. 0.000 to 3.000 and Scrapping Between Km. 3.000 to Km. 3.500 And Silt clearance of Tarkulwa mr. Between Km. 0.000 to 2.000 and Scrapping work Between Km. 2.000 to Km. 3.100]2026_UPIDC_1198979_101
12/11/2026 06:30:00 am
[Silt clearance of Karitin Minor From 0.000 to 2.000 And Silt clearance of Bharsar Minor From 0.000 to 1.800]2026_UPIDC_1198979_99
12/11/2026 06:30:00 am
[Silt clearance of Sudhiyani Minor From 0.000 to 3.080]2026_UPIDC_1198979_98
12/11/2026 06:30:00 am
[Silt clearance of Barnai Minor Between Km. 0.000 to 2.600]2026_UPIDC_1198979_111
12/11/2026 06:30:00 am
[Silt clearance of Champapur Minor Between Km. 0.000 to 2.200]2026_UPIDC_1198979_106
12/11/2026 06:30:00 am
[Silt clearance of Pattan Minor From 0.000 to 4.000]2026_UPIDC_1198979_96
12/11/2026 06:30:00 am
[Silt clearance of Asna Minor From 0.000 to 4.500]2026_UPIDC_1198979_97
12/11/2026 06:30:00 am
[Silt clearance of Raghopur Minor Between Km. 0.000 to 3.000]2026_UPIDC_1198979_110
12/11/2026 06:30:00 am
[Silt clearance of Pachrukhiya mr. Between Km. 0.000 to 2.400 and Scrapping Between Km. 2.400 to Km. 2.720 And Silt clearance of Barwa kala mr. Between Km. 0.000 to 1.600 and Scrapping Between Km. 1.600 to Km. 2.600 and Dhangadha mr. Km. 0.000 to 2.00]2026_UPIDC_1198979_102
12/11/2026 06:30:00 am
[Silt clearance of Bhimpur Minor Between Km. 0.000 to Km. 1.800]2026_UPIDC_1198979_113
12/11/2026 06:30:00 am
[Silt clearance of Baliyawa Minor Between Km. 0.000 to 3.000]2026_UPIDC_1198979_112
12/11/2026 06:30:00 am
[Silt clearance and Scraping of Paharpur mr. Between Km. 0.000 to 2.980]2026_UPIDC_1198979_104
12/11/2026 06:30:00 am
[Silt clearance of Bishunpur mr. Between Km. 0.000 to 2.000]2026_UPIDC_1198979_103
12/11/2026 06:30:00 am
[Silt clearance of Karmaha Minor Between Km. 0.000 to 2.800]2026_UPIDC_1198979_108
12/11/2026 06:30:00 am
[Silt clearance of Dubauli mr. between Km. 0.000 to 3.800 including tailgul]2026_UPIDC_1198979_92
12/11/2026 06:30:00 am
[Silt clearance of Shampur mr. between Km. 0.000 to 4.200]2026_UPIDC_1198979_93
12/11/2026 06:30:00 am
[Semara mr. between Km. 0.000 to 3.600 and Silt clearance of Manjhariya mr. between Km. 0.000 to 0.850]2026_UPIDC_1198979_91
12/11/2026 06:30:00 am
[Silt clearance of Belwa Baitalpur Minor Between Km. 0.000 to 2.800]2026_UPIDC_1198979_107
12/11/2026 06:30:00 am
[Silt clearance of Hetimpur mr. between Km. 0.000 to 4.000]2026_UPIDC_1198979_90
12/11/2026 06:30:00 am
[Silt clearance of Dharmpur mr. between Km. 0.000 to 3.000]2026_UPIDC_1198979_94
12/11/2026 06:30:00 am
[Silt clearance of Bhagwanpur mr. Between Km. 0.000 to 3.000 and Silt clearance of Karjaha mr. Between Km. 0.000 to 2.200]2026_UPIDC_1198979_105
12/11/2026 06:30:00 am
[Silt clearance of Khairatawa mr. between Km. 0.000 to 1.300]2026_UPIDC_1198979_95
12/11/2026 06:30:00 am
[Silt clearance of Balkuwa Minor Between Km. 0.000 to 3.000]2026_UPIDC_1198979_109
12/11/2026 06:30:00 am
[silt/Scraping work at Trilokpur minor from km. 2.565 to km. 6.400]2026_UPIDC_1200461_8
13/11/2026 07:30:00 am
[Silt Clearance/Scraping work in Trilokpur minor from km. 0.000 to km. 2.515]2026_UPIDC_1200461_7
13/11/2026 07:30:00 am
[Silt/Scraping work in Laxminagar minor from km. 0.000 to km. 3.250]2026_UPIDC_1200461_6
13/11/2026 07:30:00 am
[Silt/Scraping work in Shankarpur minor from km. 0.000 to km. 2.330]2026_UPIDC_1200461_5
13/11/2026 07:30:00 am
[AS PER TENDER NOTICE- 03 LOT- 14]2026_UPIDC_1201015_20
12/11/2026 05:30:00 am
[AS PER TENDER NOTICE-03 LOT-02]2026_UPIDC_1201015_19
12/11/2026 05:30:00 am
[silt clearance of Thana Mr from km 0.000 to 5.877 (Lot 31)]2026_UPIDC_1194701_5
12/11/2026 04:30:00 am
[Silt clearance of Janigawn Mr from km 0.000 to 6.349 (Lot 26]2026_UPIDC_1194672_5
12/11/2026 04:30:00 am
[Silt clearance of Kaduri Mr from km 0.000 to 7.000 (Lot 18)]2026_UPIDC_1194773_5
12/11/2026 04:30:00 am
[Silt clearance of Ramnagar from km 0.000 to 5.200 (Lot 17]2026_UPIDC_1194596_5
12/11/2026 04:30:00 am
[Silt clearance of Sank Mr from km 0.000 to 8.250 (Lot 16)]2026_UPIDC_1194772_5
12/11/2026 04:30:00 am
[Silt clearance of Tarona Mr from km 0.000 to 6.050 (Lot 15)]2026_UPIDC_1194771_5
12/11/2026 04:30:00 am
[Silt clearance of Mawai Mr from km 0.000 to 6.039 (Lot 14)]2026_UPIDC_1194584_5
12/11/2026 04:30:00 am
[Silt clearance of Kinhauti Mr from km 0.000 to 4.900 (Lot 13)]2026_UPIDC_1194576_5
12/11/2026 04:30:00 am
[Silt clearance of Kalyanmal Mr from km 0.000 to 6.800 (Lot 12)]2026_UPIDC_1194558_5
12/11/2026 04:30:00 am
[Silt clearance of Bahuti Mr from km 0.000 to 4.200 (Lot 08)]2026_UPIDC_1194524_5
12/11/2026 04:30:00 am
[Silt clearance of Sandila Dy from km 0.000 to 24.939 (Lot 05]2026_UPIDC_1194770_5
12/11/2026 04:30:00 am
[Repairing of Fall D/S Floor at km. 80.179 of R.G.F.C.]2026_UPIDC_1205050_5
18/11/2026 08:30:00 am
[Repairing of Parapet, Bed Floor and Colour washing on V.R.B. at km. 71.643 of R.G.F.C.]2026_UPIDC_1205050_4
18/11/2026 08:30:00 am
[Repairing of Pontoons, Making Approach Path, Abutment and Assembling of Pontoon Bridge at Bahanala near Vill. Zaithal-Sherpur.]2026_UPIDC_1205050_3
18/11/2026 08:30:00 am
[Repairing of Pontoons, Making Approach Path, Abutment and Assembling of Pontoon Bridge at Bahanala near Vill. Wazidpur-Sultanpur.]2026_UPIDC_1205050_2
18/11/2026 08:30:00 am
[Repairing of Pontoons, Making Approach Path, Abutment and Assembling of Pontoon Bridge at Bahanala near Vill. Daranagar.]2026_UPIDC_1205050_1
18/11/2026 08:30:00 am
[TN 14/EE/2026-27 Repair of Cattle Ghat at Km. 7.250, 10.200, 12.067 and 17.300 of Right Bhola Dy. (Lot-7)]2026_UPIDC_1204638_7
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Reconstruction of V.R.B (Box Culvert) at km 0.310 of Didwari minor in District Ghaziabad. (Lot-6) ]2026_UPIDC_1204638_6
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Reconstruction of V.R.B (Box Culvert) at km 1.690 of Maw minor in District Ghaziabad. (Lot-5)]2026_UPIDC_1204638_5
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Reconstruction of Box Culvert (V.R.B) at Km 0.750 of Maw minor in District Ghaziabad. (Lot-4)]2026_UPIDC_1204638_4
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Reconstruction of Box Culvert (V.R.B) at Km 1.750 of Sherpur minor in District Ghaziabad. (Lot-3)]2026_UPIDC_1204638_3
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Reconstruction of Box Culvert (V.R.B) at Km 5.240 of Aghera minor in District Ghaziabad. (Lot-2)]2026_UPIDC_1204638_2
11/11/2026 09:30:00 am
[TN 14/EE/2026-27 Janpad Ghaziabad ke antargat Kisan Seva Kendra, Modinagar ki rajkiya bhumi ki suraksha hetu bowndri wall ka nirman karya (Lot-1)]2026_UPIDC_1204638_1
11/11/2026 09:30:00 am
[Repairing and painting of VRB s of Haldaur Dy. At Km 8.932, km. 7.590, km. 6.950, km. 10.800, km. 10.200 and km. 13.700 for year 2026-27 (Lot-1)]2026_UPIDC_1203906_1
13/11/2026 09:30:00 am
[Estimate for E/W in Scrapping work of Sagra Dy from km 17.300 - 36.600]2026_UPIDC_1199071_71
11/11/2026 11:30:00 am
[Silt clearance of Rasoolpur Govindpur Minor (km.0.00-5.200),Purebhan Minor (km.0.00-1.600) Newadhiya Minor (km.0.00-1.900) and Kashipur Minor(km.0.00-3.600)]2026_UPIDC_1199071_70
11/11/2026 11:30:00 am
[Estimate For Silt Cleance of Pratapgarh Dy. from Ch. Km. 15.025 to 31.600 in Rabi -1434 F]2026_UPIDC_1199071_69
11/11/2026 11:30:00 am
[Silt clearance of Mawaikala Mr. ( km 0.00 to 2.60 ).Aintu Mr (km 0.00m-3.400) and Shailwara Mr. (km 0.00 to 4.00)]2026_UPIDC_1198634_60
11/11/2026 11:30:00 am
[Silt, Jungle and clearance work of pingri Minor (km 0.00 to 3.300), silawatpur Min (km 0.00 to 3.200).]2026_UPIDC_1198634_54
11/11/2026 11:30:00 am
[Earth work in silt clearance/Scrapping of Dhauli Mr form km 0.000 km 7.400]2026_UPIDC_1195593_23
11/11/2026 11:30:00 am
[Silt clearance of Babhanpur Mr. ( km 0.000 to 3.80 ). Jakhamai Mr. (0.00 t0 3.600) and Antamau Mr. (0.00 to 3.000)]2026_UPIDC_1198634_59
11/11/2026 11:30:00 am
[Estimate for Earth work silt clearance and scraping of Adlabad minor from km. 0.000 to 5.800,hameedpur minor km. 0.000 to 1.600 and kakariha minor km. 1.400]2026_UPIDC_1198634_58
11/11/2026 11:30:00 am
[Estimate for earth work silt clearnace and scraping of Madhwapur minor from km. 0.000 to 4.400 and kushwapur minor km.0.000 to5.100]2026_UPIDC_1198634_57
11/11/2026 11:30:00 am
[Silt clearance, Jungle clearance and scrapping work of Bansiyara Minor from km 0.00 to 4.000, Jamlamau minor km 0.00 to km 4.000 and Patti minor km 0.00 to km 2.400]2026_UPIDC_1198634_56
11/11/2026 11:30:00 am
[Silt and Jungle clearance of Bhulsa Minor km 0.00 to 1.400, Khama Minor km 0.00 to 2.800, Raiyapur Mr from Km 0.00 to Km 2.300 and Umraoganj Mr from Km 0.00 to Km 3.200 in Rabi-1434 F Year 2026-27]2026_UPIDC_1198634_55
11/11/2026 11:30:00 am
[ Estimate For Silt Cleance of Belkhari Mr.. from Km.0.0000 to 2.800 and Bhadohi mr from km 0.000 to 1.900]2026_UPIDC_1199071_67
11/11/2026 11:30:00 am
[Estimate For Silt Cleance of Guripur Mr. from Ch. Km. 0.00 to 2.00 ,Hariherpur Mr. from Ch. Km. 0.00 to 1.600 and Newada Mr. from Ch. Km. 0.00 to 2.500 in Rabi -1434 F]2026_UPIDC_1199071_66
11/11/2026 11:30:00 am
[ Estimate For Silt Cleance of Jethwara Dy. from Ch. Km. 9.025 to 16.200 in Rabi -1434 F]2026_UPIDC_1199071_65
11/11/2026 11:30:00 am
[Estimate For Silt Cleance of Jagdishpur Mr.. from Km.0.000 to 1.900 Mishirpur mr from km 0.000 to 2.000 and Chaubeypur mr from km 0.000 to 2.000]2026_UPIDC_1199071_68
11/11/2026 11:30:00 am
[Completing canal section from km. 9.713 to km. 9.744 of RPBC]2026_UPIDC_1198604_8
11/11/2026 06:30:00 am
[Construction of Pipe Culvert at Km. 2.070 of Gajarawa Khadi Dy.]2026_UPIDC_1198604_10
11/11/2026 06:30:00 am
[Construction of Pipe Syphon at Km. 2.350 of Gajarawa Khadi Dy.]2026_UPIDC_1198604_11
11/11/2026 06:30:00 am
[Construction of Pipe Culvert at Km. 2.815 of Gajarawa Khadi Dy.]2026_UPIDC_1198604_13
11/11/2026 06:30:00 am
[Construction of Pipe Syphon at Km. 2.650 of Gajarawa Khadi Dy.]2026_UPIDC_1198604_12
11/11/2026 06:30:00 am
[Lot-11 (Silt clearance of Mujahida Minor from km 0.000 to km 4.600 and Sonwal Minor from km 0.000 to km 4.300)]2026_UPIDC_1191373_91
11/11/2026 06:30:00 am
[ Lot-09 (Silt clearance of Kanaura Minor from km 0.000 to km 3.600, Ahirauli Minor from km 0.000 to km 2.600, Kurmaul Minor from km 0.000 to km 2.400, and Nahar Chhapra Minor-1 from km 0.000 to km 1.600)]2026_UPIDC_1191373_90
11/11/2026 06:30:00 am
[Completing canal section from km. 9.783 to km. 9.816 of RPBC.]2026_UPIDC_1198604_9
11/11/2026 06:30:00 am
[Silt clearance of Rampur pratham mr. from KM 0.000 to KM 3.950, Lauhar paschim mr. from KM 0.000 to KM 4.470 and Kanupur mr. from KM 0.000 to KM 2.842]2026_UPIDC_1204646_20
10/11/2026 05:30:00 am
[Silt clearance of Dhammaur mr. from KM 0.000 to KM 2.666, Mai mr. from KM 0.000 to KM 4.545, Ghatkaur mr. from KM 0.000 to KM 2.630 and Khandahar mr. from KM 0.000 to KM 1.365]2026_UPIDC_1204646_18
10/11/2026 05:30:00 am
[Silt clearance of Kalyanpur dy from KM 0.000 to KM 9.271]2026_UPIDC_1204646_19
10/11/2026 05:30:00 am
[ SILT CLEARANCE/SCRAPPING OF DOGHRA MINOR, SHANKARPUR MINOR AND DATIVAR MINOR]2026_UPIDC_1205265_1
10/11/2026 05:00:00 am
[silt clearewnce Lot 44]2026_UPIDC_1205812_1
12/11/2026 11:30:00 am
[Reparing of head Regulator]2026_UPIDC_1194696_7
10/11/2026 12:00:00 pm
[Silt clearance of KMC between km 4.800 to km 12.450]2026_UPIDC_1195510_91
11/11/2026 10:30:00 am
[TENDER NOTICE NO. 04-EE-2026-27, LOT NO. 10]2026_UPIDC_1194385_24
10/11/2026 11:10:00 am
[02/EE/2026-27CHIGORI]2026_UPIDC_1205717_1
21/11/2026 08:30:00 am
[Earth Work in Silt Clearance/Scraping of Sardaha Mr. from Km. 0.000 to Km. 1.800, Isarpar Mr. from Km. 0.000 to Km. 1.100 and Sawarupur Mr. from Km. 0.000 to Km. 1.000 ]2026_UPIDC_1198115_48
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Khadarampur Mr. from Km. 0.000 to Km. 2.600 and Dahi Mr. from Km. 0.000 to Km. 2.400 ]2026_UPIDC_1198115_47
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Bhitari Mr. from Km. 0.000 to Km. 1.600, Dharauli Mr. from Km. 0.000 to Km. 1.600, and Gaura Mr. from Km. 0.000 to Km. 1.000 ]2026_UPIDC_1198115_46
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Visaipur Mr. from Km. 0.000 to Km. 2.800]2026_UPIDC_1198115_45
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Bhutani Mr. from Km. 0.000 to Km. 2.100, Pashchimpatti Mr. from Km. 0.000 to Km. 0.800, and Gadhawa Mr. from Km. 0.000 to Km. 1.600 ]2026_UPIDC_1198115_44
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Baidara Mr. from Km. 0.000 to Km. 2.000, Parsamanpur Mr. from Km. 0.000 to Km. 0.800, Raghunathpur Mr. from Km. 0.000 to Km. 1.200 and Sansara Mr. from Km. 0.000 to Km. 0.800 ]2026_UPIDC_1198115_43
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Fulehara Mr. from Km. 0.000 to Km. 2.600 and Kadipur Mr. from Km. 0.000 to Km. 1.600 ]2026_UPIDC_1198115_42
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of PAIDHIYA Mr. from Km. 0.000 to Km. 3.000 ]2026_UPIDC_1198115_41
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Panti Mr. from Km. 0.000 to Km. 1.680, Samadi Mr. from Km. 0.000 to Km. 2.100 and Achchhepur Mr. from Km. 0.000 to Km. 1.700 ]2026_UPIDC_1198115_40
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Vistara Mr. from Km. 0.000 to Km. 2.100 and Alhani Mr. from Km. 0.000 to Km. 1.800 ]2026_UPIDC_1198115_39
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Bhedaura Mr. from Km. 0.000 to Km. 3.800 ]2026_UPIDC_1198115_38
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Molnathpur Mr. from Km. 0.000 to Km. 6.000 ]2026_UPIDC_1198115_37
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Dingurpur Mr. from Km. 0.000 to Km. 1.600 and Tahar Kishundevpur Mr. from Km. 0.000 to Km. 1.650 ]2026_UPIDC_1198115_36
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Bindui Mr. from Km. 0.000 to Km. 1.600 and Gajpat Mr. from Km. 0.000 to Km. 1.500 ]2026_UPIDC_1198115_35
13/11/2026 05:30:00 am
[Earth Work in Silt Clearance/Scraping of Dashwantpur Mr. from Km. 0.000 to Km. 2.400 and Mukhalispur Mr. from Km. 0.000 to Km. 2.700 ]2026_UPIDC_1198115_34
13/11/2026 05:30:00 am
[Restoration of internal section of Rapti Link Channel from km 0.00 to km 12.300 in District Shrawasti. (Retender)]2026_UPIDC_1167986_22
21/11/2026 09:30:00 am
[Lot-09]2026_UPIDC_1187829_30
12/11/2026 05:30:00 am
[Lot-0606]2026_UPIDC_1187829_29
12/11/2026 05:30:00 am
[Lot-05]2026_UPIDC_1187829_28
12/11/2026 05:30:00 am
[Lot-4]2026_UPIDC_1187829_26
12/11/2026 05:30:00 am
[Earth Work in Silt Clearance Bed Side slope Scrapping Of Uska Minor From K.M. 0.000 To K.M. 1.400]2026_UPIDC_1200560_38
10/11/2026 06:30:00 am
[Earth Work in Silt Clearance Bed Side slope Scrapping Of Turkauliya Minor From K.M. 0.000 To K.M. 3.600]2026_UPIDC_1200560_37
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Mahla Minor (from km 0.000 to km 1.800)]2026_UPIDC_1200560_36
10/11/2026 06:30:00 am
[Scraping work of bed and side slopes of Dhusari Minor (from km 0.000 to km 2.900) ]2026_UPIDC_1200560_35
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Dafra Minor (from km 0.000 to km 2.100)]2026_UPIDC_1200560_34
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Lakhanpara Minor (from km 0.000 to km 3.700)]2026_UPIDC_1200560_33
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Kapiya Minor (from km 0.000 to km 3.700)]2026_UPIDC_1200560_32
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Katya Minor (from km 0.000 to km 2.800)]2026_UPIDC_1200560_31
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Bhavpur Minor (from km 0.000 to km 5.300)]2026_UPIDC_1200560_30
10/11/2026 06:30:00 am
[Silt Earth clearance work of Atari Minor from km. 0.000 to km. 4.400, before running period of canal 1434 Rabi Fasli]2026_UPIDC_1200560_29
10/11/2026 06:30:00 am
[Scraping work in internal section of Narayanpur Minor from km 0.000 to km 4.600 before running period of canal 1434 Rabi Fasli]2026_UPIDC_1200560_28
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Chiliha Rajwaha (from km 0.000 to km 5.400)]2026_UPIDC_1200560_27
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Chaurasi Minor (from km 0.000 to km 8.000)]2026_UPIDC_1200560_26
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Jagdishpur Minor from km 0.000 to km 5.900]2026_UPIDC_1200560_25
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Naugarh Minor from km 0.000 to km 10.100]2026_UPIDC_1200560_24
10/11/2026 06:30:00 am
[Scraping and silt clearance work of bed and side slopes of Udaipur Minor from km 0.000 to km 8.100]2026_UPIDC_1200560_23
10/11/2026 06:30:00 am
[Scraping work of bed and side slopes of Kodra Minor from km 0.000 to km 6.600]2026_UPIDC_1200560_22
10/11/2026 06:30:00 am
[Scraping work in internal section from km 0.000 to km 2.000 Silt Earth Clearance work from km. 2.000 to 6.600 of Champapur Minor before running period of canal 1434 Rabi Fasli]2026_UPIDC_1200560_21
10/11/2026 06:30:00 am
[Patch work of service road]2026_UPIDC_1204357_1
13/11/2026 08:30:00 am
[Supply and Installation Automatic weather station(AWS) Digital water level recorder (DWLR) Radar type water level recorder and Water level indicator sounder for Sharda Sagar Dam. (Lot 04)]2026_UPIDC_1203964_4
18/11/2026 05:30:00 am
[Repair work on an existing building for the establishment of a dam safety and control center at Km. 0.000 of the Sharda Sagar Dam(Lot 03)]2026_UPIDC_1203964_3
18/11/2026 05:30:00 am
[Cleaning jungle of Sharda Sagar Dam between km 10.000 to 20.000 (Lot 02)]2026_UPIDC_1203964_2
18/11/2026 05:30:00 am
[Cleaning jungle of Sharda Sagar Dam between km 0.000 to 10.000(Lot 01)]2026_UPIDC_1203964_1
18/11/2026 05:30:00 am
[Silt clearance of Lahana mr. from KM 0.000 to KM 3.634, Mochwa mr. from KM 0.000 to KM 2.367, Sanjaywan mr. from KM 0.000 to KM 1.527 and Bhojpur mr. from KM 0.000 to KM 4.175]2026_UPIDC_1204646_17
10/11/2026 05:30:00 am
[Silt clearance of Kalyanpur mr. from KM 0.000 to KM 2.399, Bahrauli mr. from KM 0.000 to KM 3.022, Amroopur mr. from KM 0.000 to KM 3.645 and Basupur mr. from KM 0.000 to KM 4.457]2026_UPIDC_1204646_16
10/11/2026 05:30:00 am
[ Silt clearance of Kadipur mr. from KM 0.000 to KM 2.616, Malhupur mr. from KM 0.000 to KM 4.766, Tiyara mr. from KM 0.000 to KM 1.032, Singhawal mr. from KM 0.000 to KM 4.030 and Sadhapur mr. from KM 0.000 to KM 3.035 ]2026_UPIDC_1204646_15
10/11/2026 05:30:00 am
[Silt clearance of Singramau dy from KM 0.900 to KM 1.400 and KM 2.400 to KM 14.389]2026_UPIDC_1204646_14
10/11/2026 05:30:00 am
[Silt clearance of Ramganj dy from KM 0.000 to KM 13.654, KM 15.200 to KM 17.213, KM 20.191 to KM 22.127, KM 23.000 to KM 31.600 and KM 35.000 to KM 60.900]2026_UPIDC_1204646_13
10/11/2026 05:30:00 am